Stockton Beach Holiday Park AV system

We were commissioned by Newcastle City Council to install a theatre system for the new Stockton Beach Holiday Park Camp Kitchen. Specification from council was the projector had to be bright and the sound had to fill the room. We also completed this project under budget.

When we were contacted it was at a late stage of the build which made our job even harder for installing all the cabling. The brackets which support the projector screen was all built in-house by us as they were not commercially available, the boards which the speakers are mounted to were also made in-house by us, as the studs in the walls did not line up with both side walls (and front), we had to come up with a solution that not only looked attractive but had to position all the speaker in the correct and uniform position.

Click on a picture to enlarge.

unpacking speakersmain system locationempty side viewsurround speaker left locationsurround speaker right locationfront view of cablingfront view of cabling workfront viewprojector screen testingprojector screenprojector bracketsepson projectoradjusting projectorFront sideviewcontrol systemfront speaker without grillright side speaker viewMarantz amplifier and Samsung PVRspeaker and control system view

 

keyboard_arrow_up